top of page

LUX 02 Privat Resort

The best holiday home included rental management

Project no EG-A/Lux-02-2026-IDN



Project Information

ü  Project development: 2026

ü  Design & Architectural Concept by Eugera Architecture Design

ü  Project Development by EUGERA GROUP Pte. Ltd.

ü  Project: Private LUX Mountain Resort – LUX 02

ü  Location: Lombok

ü  Country: Indonesia

ü  Project Management: Regional Management Company









Construction Specification

Structural System

  • Fully engineered structural steel frame

  • Hot-dip galvanized steel construction

  • Modular off-site prefabrication

  • Bolted structural connections

  • Corrosion protected

Floor System

Steel – ComFloor Steel Concrete Composite Floor

  • Structural steel beams

  • Composite concrete slab

  • Acoustic insulation

  • Thermal insulation

  • Moisture barrier


Structural Performance

Earthquake Resistant up to Magnitude 8.2Designed according to Australian and Indonesian Structural Standards.

Fire Protection: Fire Classification: A1Non-combustible structural system.

Waterproofing: Waterproof Rating: Class AComplete waterproof building envelope.

External Walls: EC-Concrete Wall Elements

  • High insulation

  • Fire resistant

  • Moisture resistant

  • Sound insulation

  • Low maintenance

Internal Walls: EC-Concrete Wall Elements

  • Moisture resistant

  • Fire resistant

  • Excellent acoustic performance

Roof Construction

  • Fully insulated roof system

  • 200 mm insulation

  • Iron roof cladding

  • Complete roof drainage system

  • Tropical climate design

Windows & Doors

Premium double-glazed sliding windows and sliding doors

  • Floor-to-ceiling glazing

  • Aluminium frames

  • Energy-efficient glazing

  • UV protection

  • High wind resistance

Main entrance: Premium full-height glass entrance door.

Interior:

  • Premium sliding doors between Living Room and Bedrooms

  • Premium moisture-resistant bathroom doors

Exterior Finishes

  • Indonesian Ironwood façade

  • Exposed steel architectural elements

  • Natural stone feature walls

  • Premium architectural lighting

  • Tropical landscaping

 

Interior Finishes

Living Room

  • Indonesian Ironwood wall finishes

  • Natural stone feature wall

  • Premium lighting

Bedrooms

  • Indonesian Ironwood finishes

  • Five-star hotel furniture

Bathrooms

ü  Walls: Natural stone tiles

ü  Floor: Natural stone flooring

ü  Premium sanitary fittings

ü  Walk-in shower

ü  Luxury vanity

ü  Designer mirrors

Kitchen

Natural stone floor tiles

Mini Kitchen including:

  • Ceramic cooktop

  • Microwave

  • Coffee machine

  • Electric kettle

  • Sink

  • Storage cabinets

  • Refrigerator / Minibar

Ceiling

Premium Indonesian Bamboo Wood

Terrace

Premium Indonesian Ironwood Decking

  • Outdoor lounge area

  • Dining area

  • Premium lighting

Electrical Installation

European Standard

  • LED lighting

  • Premium switches

  • Energy-efficient installation

  • Smart TV connections

  • USB charging outlets

Air Conditioning

Fully air-conditionedHigh-efficiency inverter system.

Connectivity

  • Starlink High-Speed WiFi

  • Telephone

  • Smart TV

Five-Star Furniture Package

Included:

  • Luxury beds 2 m x 2 m

  • Designer sofas

  • Dining table

  • Outdoor furniture

  • Wardrobes

  • Bathroom furniture

Five-Star Equipment Package

Bedrooms

  • Smart TV

  • Safe

  • Hairdryer

  • Bathrobes

  • Slippers

Living Room

  • Smart TV

  • Designer furniture

Kitchen

  • Coffee machine

  • Electric kettle

  • Ceramic cooktop

  • Microwave

  • Minibar

  • Glasses

  • Cups

  • Plates

  • Cutlery

  • Pots

  • Cooking utensils

Bathroom

  • Soap dispenser

  • Toilet paper holder

  • Premium towel rails

  • Luxury towels

Additional

  • Umbrellas

  • Complimentary Wi-Fi

  • 24/7 Guest Service

 

Construction Time

Factory Production + On-site Installation

Approximately 4 weeks turnkey, subject to site preparation, foundation completion, logistics, weather conditions, and local approvals.


 
 
 

Kommentare


68 Circular Road, 02-01

049422 Singapore

Send Us a Message

Last update: 14.September.2026
 

Eugera Group und Partner Project Investment.png

© 2017/2026 by EUGERA GROUP Pte. Ltd. Project development, Steel Structure, Modular Projects, Hospitals and Medical Center

bottom of page